
T1, with the total length of 16.803km, has 23 stations. T2, with the total length of 19.192km. L1 and L2 have a total of 25 stations with 43 trains. This project has been put into revenue service successfully in April 2018. In 2023, L3 was opened with the original line conditions unchanged, with an average daily ridership of nearly 30,000.
This project provided by FITSCO mainly include center dispatching management system, main line switch control system, onboard system, junction signal priority system, training system and large screen display system.
The system achieves several technological breakthroughs, such as double-line networked operation dispatching management, junction priority control in prosperous area, switch and priority linkage control in complex junction and so on.
