
With the total length of 20.077km, this line has 28 stations and 24 trams.
The whole line is equipped with Dujiangyan station vehicle base, Zhongxing depot and Panda Valley depot. The project has been put into revenue service successfully in May 2024.
FITSCO provides ATP protection functions including red light running protection and overspeed protection to ensure the safe operation of the train.
