References
With a total length of 101 kilometers and a maximum operating speed of 140 km/h, the route is divided into three sections: the Intercity Railway (TIC), the Intermunicipal Railway (TIM), and São Paulo Metro Line 7. The core operation control system of the project adopts FITSCO’s ETCS-2+ ATO signal system solution that meets international delivery requirements. (The latest ETCS4.0 version).
The Monterrey Lines 4,6 EPC project is a key project of the Mexican Federal government, which is of great strategic importance to improve the urban transportation of Monterrey.FITSCO provide JeRail®CBTC signaling system solution for the project to realize fully automatic operation (FAO) GoA4 operation.
Adopt Train Autonomous Circumambulation System (TACS) and reaches the highest automation level (GoA4). FITSCO participates in the overall system design and development of TACS.Since its opening in April 2024, the TACS demonstration project — Qingdao Metro Line 6 — has maintained smooth and precise train operation.
FITSCO fully leverages the advantages of its self-developed products, adopts simultaneous development of environmental simulation and design, and enhances the quality of on-site software and testing efficiency. Implement 24-hour non-stop debugging by multiple teams. Overcoming the impact of the epidemic, it took only 15 months from signing the contract to operation, ranking first in the industry.