Typical Cases

Wuhan_Chedu_Tram_T1

Wuhan CheduTram T1 Signaling System

With the total length of 18.625km, this line has 25 ground stations and 21 trams. FITSCO provides a complete set of operation control systems, including main line signaling system and depot signaling system. This project, which was put into trial operation in July 2017, is the tram project with the most stations and intersections opened

Wuhan CheduTram T1 Signaling System Read More »

Scroll to Top